Guardar

TUE NIATIONAL ARCHIVES By ML HARI Date 24 18 SH THREE Unit Minimum Maximum Tach Ne ter Kach Pair AAMWAYS (Continued)
Aake mua sills Repair bridges.
Repair joints.
Replace fish plates.
Hebuild bridges.
Grading.
Cloan right 01 ray in old banan Clean right of way (new work. Lift, line, and box.
Take up old track.
MISCELLANEOUS:. 60 00. 70 26 10 00. 72 032. 192. 09 Cubic veter Lineal Weter. 038. 08 Meter TRACK BUILDINGSU 12. 00 clean yards.
Cut and haul house posts.
Hectare Kaoh 12:00. 30 Hootere Each BALSA: Remove areopers.
dut deliver orosas ties for 10g cers.
Cut and deliver car stakes.
Cut and haul natural growth Logs.
out and haul cultivated logs.
Tram LOBS.
Load logs on railway cars.
esaw do 1wbo.
08 01 vo Ivot.
85 021 DECORATIONS: Ordinary day labor rate.
Dey 60 ETRHOOD.
cut and haul firewood.
Cut Ilmuwuva sú dvad in cord 00 Way oy 30. 00 HARDWOOD: Board foot Cut and haul logs.
Load logs on railway cars.
Sak BEDY8º8ounbe busc as. 016 LIVE STOCK: Shoe males.
Foot Each Shoot monkeys.
Shoot squirrels.
Shoot woodpeckers.
PASTURES: 12. 00 Cut and transfer gross for planting. Bundle

    Notas

    Este documento no posee notas.